With thorough requirments, we can also produce your unique made item. Furthermore, all our creation procedures are in compliance with ISO9002 specifications. In 2000, EPG took the direct in gaining ISO14001 setting administration certificate and thereafter handed the inspection of clear generation and recycling economy, winning the title of “Zhejiang Green Organization”. one. We are the supplier of Leaking EPT Mend Clamps for JCEP and Fuel EPT EPTline Networks in over one hundred EPTT Metropolitan areas and some foreign nations incXiHu (West EPT) Dis.Hu (West EPT) Dis. United kingdom, Australia, Sri Lanka and so on.
two. Characteristics of products :
– consist of the two 50 % cast iron tubes with great top quality rubber seal inside of
– the most econimical and efficient way for the rush mend of the leak or burst of the pipeline.
– no want disassembly from the entire body of pipeline following repair
3. The checklist of dimensions :
S/N | Suited for | Dimensions | Nominal Diameter | OD (outside the house diameter) | |||
W-EPT | Z-EPT | C-EPT | D-EPT | ||||
one | Iron EPT | Dg40 | forty | 48.3 | forty eight. | ||
two | Iron EPT | Dg50 | 50 | sixty.three | sixty. | ||
three | Iron EPT | Dg65 | sixty five | seventy six.one | seventy six. | ||
4 | Iron EPT | Dg80 | 80 | 88.five | 89. | ninety three. | ninety eight. |
5 | Iron EPT | Dg100 | 100 | 114. | 114. | 118. | 118. |
6 | Iron EPT | Dg150 | a hundred and fifty | 165. | 165. | 169. | 170. |
7 | Iron EPT | Dg200 | two hundred | 219. | 218. | 220. | 220. |
8 | Iron EPT | Dg250 | 250 | 273. | 271.six | 274. | |
9 | Iron EPT | Dg300 | three hundred | 325. | 322.8 | 326. | |
10 | Iron EPT | Dg350 | 350 | 374. | 378. | ||
11 | Iron EPT | Dg400 | 400 | 426. | 425.six | 429. | |
12 | Iron EPT | Dg450 | 450 | 476.eight | 480. | ||
13 | Iron EPT | Dg500 | 500 | 530. | 528. | 532. | |
fourteen | Iron EPT | Dg600 | 600 | 630.8 | 635. | ||
fifteen | Iron EPT | Dg700 | seven hundred | 733. | 738. | ||
16 | Iron EPT | Dg800 | 800 | 836. | 842. | ||
seventeen | Iron EPT | Dg900 | 900 | 939. | 945. | ||
18 | Iron EPT | Dg1000 | one thousand | 1041. | 1048. | ||
19 | Iron EPT | Dg1200 | 1200 | 1246. | 1255. | ||
twenty | Iron EPT | Dg1400 | 1400 | 1462. | |||
21 | Iron EPT | Dg1600 | 1600 | 1668. | |||
one | Extended Iron EPT | Dg80 | 80 | 88.5 | 89. | ninety three. | ninety eight. |
two | Extended Iron EPT | Dg100 | one hundred | 114. | 114. | 118. | 118. |
three | Prolonged Iron EPT | Dg150 | 150 | one hundred sixty five. | a hundred sixty five. | 169. | a hundred and seventy. |
4 | Prolonged Iron EPT | Dg200 | 200 | 219. | 218. | 220. | 220. |
5 | Prolonged Iron EPT | Dg250 | 250 | 273. | 271.six | 274. | |
6 | Extended Iron EPT | Dg300 | three hundred | 325. | 322.8 | 326. | |
seven | Extended Iron EPT | Dg400 | four hundred | 426. | 425.six | 429. | |
8 | Extended Iron EPT | Dg500 | five hundred | 530. | 528. | 532. | |
9 | Extended Iron EPT | Dg600 | 600 | 630.8 | 635. | ||
Notice: | |||||||
1. W-EPT: welded steel pipeline, Z-EPT: zinc-plated steel pipeline | |||||||
C-EPT: forged iron pipeline, D-EPT: ducitile iron pipeline. |
S/N | Ideal for | Size | Nominal Diameter | OD (outside the house diameter) | ||
SRCP | PRCP | |||||
Phase 1 | Phase 3 | |||||
1 | Concrete EPT | Z100 | a hundred | a hundred and fifty | ||
two | Concrete EPT | Z150 | 150 | two hundred | ||
three | Concrete EPT | Z200 | two hundred | 260 | ||
four | Concrete EPT | Z250 | 250 | 320 | ||
5 | Concrete EPT | Z300 | 300 | 380 | ||
six | Concrete EPT | Z400 | four hundred | 490 | ||
seven | Concrete EPT | Z500 | 500 | 610 | ||
eight | Concrete EPT | Z500-three | five hundred | 610 | ||
9 | Concrete EPT | Z600 | 600 | 720 | ||
ten | Concrete EPT | Z800-1 | 800 | 920 | ||
eleven | Concrete EPT | Z800-3 | 800 | 940 | ||
12 | Concrete EPT | Z900 | 900 | 1030 | 1050 | |
13 | Concrete EPT | Z1000-one | 1000 | 1140 | ||
fourteen | Concrete EPT | Z1000-three | a thousand | 1160 | ||
fifteen | Concrete EPT | Z1200 | 1200 | |||
16 | Concrete EPT | Z1400 | 1400 | |||
1 | Prolonged Concrete EPT | Zg300-3 | 300 | |||
two | Extended Concrete EPT | Zg400-three | 400 |
S/N | Appropriate for | Size | OD |
1 | Plastic EPT | P63 | 63 |
two | Plastic EPT | P75 | 75 |
three | Plastic EPT | P90 | 90 |
4 | Plastic EPT | P110 | a hundred and ten |
5 | Plastic EPT | P125 | one hundred twenty five |
6 | Plastic EPT | P160 | one hundred sixty |
seven | Plastic EPT | P140 | a hundred and forty |
eight | Plastic EPT | P160 | one hundred sixty |
nine | Plastic EPT | P180 | 180 |
10 | Plastic EPT | P200 | two hundred |
eleven | Plastic EPT | P225 | 225 |
twelve | Plastic EPT | P250 | 250 |
13 | Plastic EPT | P280 | 280 |
14 | Plastic EPT | P315 | 315 |
fifteen | Plastic EPT | P355 | 355 |
sixteen | Plastic EPT | P400 | 400 |
17 | Plastic EPT | P450 | 450 |
18 | Plastic EPT | P500 | 500 |
19 | Plastic EPT | P560 | 560 |
20 | Plastic EPT | P630 | 630 |
21 | Plastic EPT | P710 | 710 |
22 | Plastic EPT | P800 | 800 |